Wednesday, 21 October 2026Barcelona 22°/ 14°Petrol

barcelonadirecto

Breaking

Ronda de Dalt

Latest Ronda de Dalt news

2 articles

Illustrative image: construction cone on the asphalt of a motorway with construction barriers in the background

La Ronda de Dalt loses a lane in each direction between exits 5 and 6 from August 3

From August 3 to 24, La Ronda de Dalt reduces a lane in each direction for tunnel works. Wiring, safety, ventilation, and lighting will be installed.