Montcada begins work to eliminate leaks at the Miquel Poblet pavilion
The Montcada i Reixac Town Hall has started waterproofing work on the Miquel Poblet pavilion roof to eliminate leaks. The project costs €200,000 and will last six months.
Latest Public works news
8 articles
The Church parking lot in Castelldefels, with 87 spaces, is repairing its pavement from August 17 for a week without fully closing.
The Montcada i Reixac Town Hall has started waterproofing work on the Miquel Poblet pavilion roof to eliminate leaks. The project costs €200,000 and will last six months.
On Thursday, August 6, the MB1 and MB2 lines in Molins de Rei will change their route due to the closure on Verge de Núria street.
Les Fontetes market moves to Parc del Turonet in August due to construction on carrer Reis. Fridays 7, 14, 21, and 28, from 9 to 1.
Manresa closes traffic on Saclosa and Cardenal Lluch from 5 August to reinforce the asphalt. There will be bus diversions and a temporary stop.
ADIF completes the second phase of the Pont dels Ocells works in Sitges, with a final night operation from 10 to 11 August. Works will resume in October.
From August 3 to 24, La Ronda de Dalt reduces a lane in each direction for tunnel works. Wiring, safety, ventilation, and lighting will be installed.
Badalona installs a marine platform with a crane to repair the Pont del Petroli damaged in 2020, with works lasting until autumn and a budget of over 4 million.